Sort

Version française

Housing

Biscarrosse Residence

Construction of 60 housing units
Biscarrosse (40), France
In progress, delivery scheduled in 2026
€7,500,000
3,900 m2 floor area 
Full assignment
Contractor, in association with AVA architectes
CDC Habitat

Lot IBM 4.1 - NOEME

Construction of 57 housing units
Bordeaux (33), France
In progress, delivery set up for 2025
€5,400,000
4 150 m2 floor area
Completed project
Covivio

Rue du Jardin Public Residence

Construction of 42 housing units, rehabilitation of an association centre and shared gardens
Bordeaux (33), France
In progress, delivery scheduled in 2025
€7,000,000
2,900 m2 floor area
Full assignment
Marignan

Participative housing Lyautey

Construction of 10 bioclimatic housing units
Bègles (33), France
In progress, delivery scheduled in 2025
€2,300,000
1,000 m2 floor area
Full assignment
CTI Group

EM4 Residence - ZAC Empalot

Construction of 64 housing units and 2 retail spaces
Toulouse (31), France
In progress, delivery scheduled in 2024
€6,500,000
4,250 m2 floor area
Full assignment
Contractor, in association with V2S Architectes
Carrère Group

Gradignan City-centre / La FAB

Construction of 135 housing units, made of stone and wood
Gradignan (33), France
Competition, Winner 2023
€27,000,000
11,000 m2 floor area
In association with DATA Architectes
Verrecchia, Quartus and Domofrance

Square Saint-Louis Residence

Construction of 255 housing units, social residence and activity spaces
Bordeaux (33), France
Delivered 2023
€22,000,000
14,000 m2 floor area
Full assignment, designed and constructed in partnership with Bouygues
Contractor, in association with Faye Architectes et Associés
Nhood and Link City

Saintes Housing

Development of a housing programme and a senior residence
Saintes (17), France
Competition 2023 with Réalités property developer
€11,210,500
6,406 m2 floor area 
Full assignment
City of Saintes

Ondres Housing

Construction of 41 housing units Eco-district of Trois Fontaines
Ondres (40), France
Building permission 2022 – Project stopped
€6,500,000
3,300 m2 floor area
Full assignment
Sobrim

Leyteire Residence

Construction of 125 student-housing units with underground parking for 40 cars
Bordeaux (33), France
Delivered 2021
€8,000,000
4,500 m2 net floor area
Partial project
Edouard Denis Promotion

The One Residence

Construction of 14 wood-frame housing units
Le Taillan-Médoc (33), France
Delivered 2021
€1,700,000
1,126 m2 floor area
Completed project
Label Promotion

Fichot House

Construction of a family house
Mérignac (33), France
Delivered 2021
€650,000 
250 m2 floor area 
Full assignment
Private

Piquey House

Renovation of an existing house in wood
Lège-Cap-Ferret (33), France
Delivered 2021
€300,000
120 m2 floor area
Full assignment
Private

Terre Sud Residence

Construction of 58 housing units
Bègles (33), France
Study phase, delivery set for 2021
€7,000,000
4,100 m2 floor area
Certification NF HQE 6* and Effinergie +
Completed project
Domofrance

Hastignan Residence

Construction of 117 housing units, retail spaces, and an underground parking
Saint-Médard-en-Jalles (33), France
Delivered 2020
€9,375,000
6,750 m2 floor area
Completed project
In partnership with Faye architectes
Severini

Andromède Residence

Construction of 125 housing units
Beauzelle (31), France
Delivered 2019
€9,400,000
9,600 m2 floor area
Partial project
Serge Mas Promotion and Promologis

Instant B Residence

Construction of 40 housing units
Bègles (33), France
Delivered 2019
€3,090,730
2,355 m2 floor area
Completed project
Contractor, in partnership with Faye architectes
Ideal Groupe

Albert-I Residence

Construction of 180 housing units and community facilities
Bordeaux (33), France
Delivered 2019
12,820 m2 floor area
Partial project
Contractor, in partnership with Faye architectes
Pichet

Alinéa Residence

Construction of 182 housing units, retail spaces, services
Mérignac (33), France
Competition (2019)
€23,000,000
17,135 m2 floor area
E2C1 certification
Completed project
Contractor, in partnership with Faye architectes
NODI

Cap Ferret House

Rehabilitation and extension of a house
Lège-Cap-Ferret (33), France
Delivered 2017
€450,000 
230 mfloor area
Full assignment
Private

Jules-Guesde Residence

Rehabilitation and construction of a 7-unit housing building with retail space
Bordeaux (33), France
Delivered 2017
€850,000
550 m2 net floor area
Completed project
Domofrance

Castorama City Block

Construction of 420 housing units, retail spaces
Mérignac (33), France
Competition (2016)
€26,545,000
36,660 m2 floor area
Completed project
PITCH Promotion

Tête Noire

Construction of shared housing units
Bordeaux (33), France
Competition (2015)
€6,500,000
4,600 m2 floor area
Completed project
Contractor, in partnership with 2PM A
SAS Darwin-Bastide and Crédit Agricole

Crous Village Universitaire n°2

Rehabilitation of 436 student housing units
Pessac (33), France
Competition, 2013
€10,380,000
7,595 m2 net floor area
Completed project
Crous de Bordeaux

Caudéran House

Rehabilitation and extension of a house
Caudéran (33), France
Delivered 2012
€400,000
250 m2 floor area
Full assignment
Private

Siarri House

Rehabilitation and extension of a house
Pessac (33), France
Delivered 2012
€180,000
150 m2 floor area
Full assignment
Private

Vétraz-Monthoux Residence

Construction of 18 community housing units
Annemasse (74), France 
Study phase: 2012
€4,500,000
2,500 m2 net floor area
BBC-certified, timber industry
Completed project
Société de Genève

Vineyards

Château de la Sauzaie

Construction of a vineyard complex for Cognac Godet with restoration of the listed parts of the château
Saint-Xandre (17), France
In progress, delivery scheduled in 2025
€8,500,000
3,950 m2 floor area
Full assignment
Godet Frères Cognac

Smith Haut-Lafitte pavilion

Creation of bioclimatic offices for the farm
Martillac (33), France
In progress, delivery scheduled in 2024
€1,200,000
500 m2 floor area
Full assignment
SAS D. Cathiard

Château Bélair-Monange

Construction of a vineyard complex
Saint-Émilion (33), France
Delivered 2023
€25,000,000
3,800 m2 floor area (including 430 m2 of rehabilitation work)
Full assignment
Contractor, in association with Herzog & de Meuron Design Architects
SC Château Bélair-Monange

Château Galand

Construction of a tasting room
Lalande-de-Fronsac (33), France
Delivered 2015
€300,000
110 m2 floor area, rehabilitation work
Completed project
SCEA Vignobles Jean Galand

Clos Saint-Martin

Rehabilitation of a wine-growing estate
Saint-Émilion (33), France
Delivered 2015
€1,000,000
400 m2 floor area
Completed project
Private

Barde-Haut Winery

Construction of a vineyard complex
Saint-Émilion (33), France
Delivered 2013
€4,500,000
1,800 m2 net floor area (including 800 m2 of rehabilitation work)
Completed project
Vignobles Garcin
Nominated for Le Moniteur’s 2010 première œuvre Award

Smith Haut-Lafitte Winery

Construction of a vineyard complex
Martillac (33), France
Delivered 2013
€5,000,000
2,800 m2 net floor area
Completed project
SAS D. Cathiard

Mixed-use

Capelle City block

Construction of residence for young workers, coworking, solidarity shop and urban agriculture under rooftop greenhouses
Bordeaux (33), France
In progress, delivery scheduled in 2026
€19,000,000
17,000 m2 floor area
NF Habitat Certification
Full assignment Contractor, in association with Faye Architectes et Associés
Vilogia and LP Promotion

Amédée Sud

Construction of a 138 bed social residence, in wood
Bordeaux (33), France
In progress, delivery scheduled in 2025
€10,000,000 
4,400 m2 floor area
Full assignment
Espaces Ferroviaires

Magasins Généreux

Rehabilitation and upgrade a mix-used project to include shops, coworking spaces, a Fab lab, a food hall, a wellness area, a youth hostel, a hotel, a restaurant and a rooftop cinema
Bordeaux (33), France
Under construction, delivery set for 2025
€11,000,000
8,356 m2 floor area
Completed project
SCI Darwin

Cluny Residence

Construction and rehabilitation of coliving and coworking spaces, restaurant and development of a listed wooded park
Bordeaux (33), France
In progress, delivery scheduled in 2025
€19,500,000
8,100 m2 floor area
Breeam Very Good Certification
Full assignment
The Babel Community, Clever Immobilier

Marionneau City Block

Construction of 21 housing units, offices and retail spaces
Bordeaux (33), France
Delivered 2023
€8,200,000
5,060 m2 floor area
Completed project
Contractor, in partnership with Faye architectes
Ideal Groupe

Third place OLHA

Construction of a third place, offices of Maison du Kintoa, coworking, meeting and exhibition spaces
Banca (64), France
Competition 2023
€2,000,000
1,000 m2 floor area 
Full assignment
Communauté d’Agglomération Pays-Basque

Dunant City Block

Construction of 160 housing units, a sports field with locker rooms, a day-care centre, a restaurant, offices, and a 440-car public parking
Bordeaux (33), France
Study phase, delivery set for 2023
€27,000,000
12,600 m2 floor area
Certification NF HQE 9*
Completed project
Réalités Promotion

Belvédère City Block

Construction of 185 housing units, a mid-sized supermarket, 3 restaurants, a medical clinic and a 443-car parking 
Bordeaux (33), France
Study phase, delivery set for 2023
€25,000,000
12,000 m2 floor area
Certification NF HQE 7*
Completed project
Contractor, in association with Güller Güller
Cogedim

Third Place Logelia

Conversion of an urban wasteland into housing units and coworking offices
Angoulême (16), France
Competition 2023
€1,900,000
735 m² floor area
Full assignment
Logelia Charente

Cenon Gallieni

Development of a real estate programme
Cenon (33), France
Competition 2023 with Nacarat property developer
€6,000,000
3,637 m² floor area
Full assignment
City of Cenon

Niort Tech III

Rehabilitation and construction of a digital ecosystem and landscaped areas
Niort (79), France
Competition 2021
€7,000,000
2,600 m² floor area 
Full assignment
Niort Agglo

Loiret Tower

Rehabilitation, expansion and upgrading of 177 housing units and common areas
Paris (75), France
Delivered, 2020
€7,800,000
6,360 m2 floor area
Designed and constructed in partnership with Eiffage
Plan Climat Paris
ICF Novidis

Lesieur City Block

Construction of 97 housing units, offices and retail spaces
Bordeaux (33), France
Delivered 2019
€9,650,000
8,300 m2 floor area
Partial project
Cogedim

Ménilmontant Residence

Construction of 87 social housing units, a gymnasium, two physical education fields, a landscaped park, a waste recovery centre and a parking
Paris (75), France
Study phase: 2018
€19,000,000
9,942 m2 floor area
Completed project
Paris Habitat OPH

Montjoie City Block

Construction of 19-classroom kindergarten and elementary school with gymnasium, alongside 272 housing units and an underground parking
Saint-Denis (93), France
Delivered 2018
€30,000,000
15,480 m2 net floor area
Designed and constructed in partnership with Bouygues
Project sponsor in association with Atelier Novembre
Séquano Aménagement

Cambacérès Campus

Construction of a digital campus, a hotel residence, a student residence, offices, and an above-ground, 257-car aerial parking
Montpellier (34), France
Competition (2017)
€26,962,000
17,750 m2 floor area
NF Habitat HQE (housing units), BREEAM and BDM (campus)
Completed project
YNOV

Amiral-Bruix Offices

Rehabilitation and expansion of offices, auditorium and restaurant
Paris (75), France
Competition (2015)
€30,000,000
16,000 m2 net floor area
Completed project
Contractor, in association with Faye architects
VINCI Real Estate for AXA

Castéja City Block

Construction and rehabilitation of 193 housing units, a hotel residence, a kindergarten and a 150-car underground parking
Bordeaux (33), France
Competition (2015)
€34,925,000
21,050 m2 floor area
Completed project
Gironde Habitat

Public Facilities

Sheds of Orléans

Redevelopment of a multi-programme brownfield site, with creation of a campus for Ynov (digital professions), third-place and Foodcourt
Orléans (45), France
In progress, delivery scheduled in 2026
€18,000,000
12,000 m2 floor area
Full assignment
Aken Ecosystèmes – Ynov

BT7 Gotham

Construction of a rooftop cultural space, creation of an Urban Culture Festival
Bègles (33), France
In progress, delivery scheduled in 2025
€1,500,000
600 m2 floor area
Full assignment
Personal initiative of the agency with the support of public investors 

Central Market of Royan

Rehabilitation of central market
Royan (17), France
In progress, delivery scheduled in 2024
€5,000,000
4,000 m2 floor area
Full assignment
Contractor, in a Design-Build contract with Sogedda/ERBTP
City of Royan

BT59

Roof extension of BT59, creation a school and a rooftop
Bègles (33), France
In progress, Feasibility study
€2,700,000 
1,300 m2 floor area
Full assignment
Bleu Mercure

Bègles Street Art Festival

Creation of artistic works and frescoes in public spaces
Bègles (33), France
May 2023 session,  forthcoming session May 2024
Nadau Architecture and Faye Architectes with the support of the Milmurs association in 2023, Mediacrossing and Bègles's town hall.

Jeunesse Famille Montaudran

Construction of a social centre and toy-library, and renovation of an ISMH listed hall – Site of Aéropostale
Toulouse (31), France
Competition 2023, on going
€2,500,000 
850 m2 floor area 
Full assignment
Toulouse City Council

House of Generations

Rehabilitation of the Maison Labat (MH) as a place for resources and intergenerational exchanges with its park
Eysines (33), France
Competition 2023, on going
€2,900,000
600 m2 floor area + park of 2,500 m2
Full assignment
Eysines City Council

Hangars M4 M5

Construction of two new harbour hangars
La Rochelle (17), France
Competition 2022
€5,1000,000
6,000 m² floor area
Reglementation ICPE - RE 2020 (french standard)
Full assignment
Port Atlantique La Rochelle

Police headquarters of Périgueux

Renovation and extension of the new police headquarters
Périgueux (24), France
Competition 2022
€3,450,000
3,000 m2 floor area 
Full assignment
SGAMI

Town Hall of Le Haillan

Rehabilitation and extension of the town hall
Le Haillan (33), France
Competition 2022
€4,808,335
1,910 m2 floor area 
Full assignment
City of Le Haillan

Logistic platform La Poste

Reconstruction of a logistic platform 
Bègles (33), France
Competition 2022 (procedure cancelled by the client)
€11,000,000
15,000 m2 floor area 
Label HQE Sustainable Building - High performance level
Full assignment
La Poste Immobilier

House of Libraries

Construction of the House of Libraries of Gironde
Eysines (33), France
Competition 2019
€10,700,000
3,900 m2 floor area
Full assignment
Gironde Departmental Council

D6 Bio Pavillon

Construction of a 16 sales units organic produce market pavilion, 1 restaurant, and offices
Rungis (94), France
Delivered 2016
€6,700,000
5,800 m2 net floor area
Completed project
Semmaris

La Réole Media Library

Rehabilitation of an 18th century priory into a media library
La Réole (33), France
Delivered 2014
€1,100,000
650 m2 net floor area, rehabilitation work
Completed project
Communauté de communes du Réolais

Grand Parc Daycare Centre

Construction of a nursery
Bordeaux (33), France
Competition, 2013
€2,700,000
1,828 m2 net floor area
Completed project
City of Bordeaux

La Rive Resort

Construction of an auditorium, restaurant and theater
Biscarrosse (40), France
Delivered 2013
€2,950,000
1,700 m² floor area 
Label HQE Echo-camp
Full assignment
SAS Domaine de La Rive

Quicksilver Pavilion

Rehabilitation of a shop, construction of a live performance space and Boardriders bar
Chamonix (74), France
Delivered 2011
€1,400,000 500 m2
500 m2
Completed project
Quiksilver

La Lande Daycare

Construction of a daycare centre with dormitories
La Lande-de-Fronsac (33), France
Delivered 2009
€850,000
500 m2 net floor area
Completed project
Town of La Lande-de-Fronsac

Service Facilities

Brazza

Construction of offices, retail and services spaces
Bordeaux (33), France
In progress, delivery scheduled in 2025
€12,000,000 
6,850 m2 floor area
Breeam Very Good Certification
Full assignment
Cardinal Group

BT6

Rehabilitation of a warehouse and elevated offices
Bègles (33), France
Delivered, 2020
€1,252,400
620 m2 floor area
Completed project
Contractor, in partnership with Faye architectes
SCI Terres Neuves

Moon Harbor

Construction of a bar-restaurant on the rooftop of the submarine base's bunker and development of a garden
Bordeaux (33), France
Competition winner 2020
€1,000,000
300 m2 floor area
Full assignment
Moon Harbor

Restaurant BIG, Bistrot Girondin

Restaurant redevelopment
Bordeaux(33), France
Delivered 2019
€420,000
170 m2 floor area
Completed project
BIG, Bistrot Girondin

Crous Office

Construction of the administrative office reception area
Pessac (33), France
Delivered 2015
€765,000
300 m2 net floor area
Completed project
Crous de Bordeaux